Hi Guys I was wondering if anyone can give some advice? I need to quote a job to Excavate 100' X 120' X 12" Depth. I need to remove the sod on top and then Loam and Clay underneath. The total is 444 cubic yards I am thinking roughly 40 Tandem loads. I usually work by the hour so I am not sure how long it would take to do. I have a Bobcat S185 and I can always get Dump trucks. It Might take me 15 or 20 at the most to load a dump truck right full. I also need to find a place to dump it all. The landfill will take cleanfill for free but I always have a problem with the sod. Any advice would help Thanks Mike