Forums
New posts
Search forums
What's new
New posts
New media
New media comments
New profile posts
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
What's new
Search
Search
Search titles and first posts only
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Visit our tractor and agricultural equipment communities:
Ingersoll Forum
Case IH Forum
Combine Forum
Hay Forum
JCB Forum
John Deere Forum
Kubota Forum
Mahindra Forum
Massey Ferguson Talk
New Holland Forum
Valtra Forum
Yanmar Forum
Zetor Forum
Farming Forum
Forums
Bobcat Skidsteer Forums
General Bobcat Skidsteer Forum
strange weird and interesting
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support SkidSteer Forum:
Message
<blockquote data-quote="864wood" data-source="post: 502" data-attributes="member: 38"><p>The most stressfull and weird job I can think of is Team Fountains brothers new house. We were due to set his new multi-piece house on a poured foundation on a thursday. On wednesday I got a call from Tommy the brother to ask me to bring my machine and help. HE SOUNDED PANIKED!!!!. It turns out the front porch I backifilled 2 weeks before was 100% clay and by getting rained on, the hydraulic pressure of the water and clay pushed the entire front porch wall over into the basement. Mind you we have a 110 ton Leibehr crane and the house showing up at 9Am the next morning. So Tommy, Team Fountain and myself with machine cut hammerd and dug all to concrete and dirt out into the wee hrs of the morning to allow us to set lolly columns in place of the missing wall and allow the house to be set in the AM. I might also add an 864 is 79" wide and the opening into the basement was 80". Not much clearance and there were other lolly columns supporting all the other steel beams in your way and if I remeber they were @ 12' on center. So just enough room to back up turn slowly and take the load out. What a way to spend an evening till 2AM. Mission acomlished though.</p></blockquote><p></p>
[QUOTE="864wood, post: 502, member: 38"] The most stressfull and weird job I can think of is Team Fountains brothers new house. We were due to set his new multi-piece house on a poured foundation on a thursday. On wednesday I got a call from Tommy the brother to ask me to bring my machine and help. HE SOUNDED PANIKED!!!!. It turns out the front porch I backifilled 2 weeks before was 100% clay and by getting rained on, the hydraulic pressure of the water and clay pushed the entire front porch wall over into the basement. Mind you we have a 110 ton Leibehr crane and the house showing up at 9Am the next morning. So Tommy, Team Fountain and myself with machine cut hammerd and dug all to concrete and dirt out into the wee hrs of the morning to allow us to set lolly columns in place of the missing wall and allow the house to be set in the AM. I might also add an 864 is 79" wide and the opening into the basement was 80". Not much clearance and there were other lolly columns supporting all the other steel beams in your way and if I remeber they were @ 12' on center. So just enough room to back up turn slowly and take the load out. What a way to spend an evening till 2AM. Mission acomlished though. [/QUOTE]
Verification
Post reply
Forums
Bobcat Skidsteer Forums
General Bobcat Skidsteer Forum
strange weird and interesting
Top