Forums
New posts
Search forums
What's new
New posts
New media
New media comments
New profile posts
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
What's new
Search
Search
Search titles and first posts only
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Visit our tractor and agricultural equipment communities:
Ingersoll Forum
Case IH Forum
Combine Forum
Hay Forum
JCB Forum
John Deere Forum
Kubota Forum
Mahindra Forum
Massey Ferguson Talk
New Holland Forum
Valtra Forum
Yanmar Forum
Zetor Forum
Farming Forum
Forums
Bobcat Skidsteer Forums
General Bobcat Skidsteer Forum
Help with quote
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support SkidSteer Forum:
Message
<blockquote data-quote="Mike763" data-source="post: 15194" data-attributes="member: 858"><p>Hi Guys I was wondering if anyone can give some advice? I need to quote a job to Excavate 100' X 120' X 12" Depth. I need to remove the sod on top and then Loam and Clay underneath. The total is 444 cubic yards I am thinking roughly 40 Tandem loads. I usually work by the hour so I am not sure how long it would take to do. I have a Bobcat S185 and I can always get Dump trucks. It Might take me 15 or 20 at the most to load a dump truck right full. I also need to find a place to dump it all. The landfill will take cleanfill for free but I always have a problem with the sod. Any advice would help Thanks Mike</p></blockquote><p></p>
[QUOTE="Mike763, post: 15194, member: 858"] Hi Guys I was wondering if anyone can give some advice? I need to quote a job to Excavate 100' X 120' X 12" Depth. I need to remove the sod on top and then Loam and Clay underneath. The total is 444 cubic yards I am thinking roughly 40 Tandem loads. I usually work by the hour so I am not sure how long it would take to do. I have a Bobcat S185 and I can always get Dump trucks. It Might take me 15 or 20 at the most to load a dump truck right full. I also need to find a place to dump it all. The landfill will take cleanfill for free but I always have a problem with the sod. Any advice would help Thanks Mike [/QUOTE]
Verification
Post reply
Forums
Bobcat Skidsteer Forums
General Bobcat Skidsteer Forum
Help with quote
Top