Forums
New posts
Search forums
What's new
New posts
New media
New media comments
New profile posts
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
What's new
Search
Search
Search titles and first posts only
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Bobcat Skidsteer Forums
General Bobcat Skidsteer Forum
853 Project
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support SkidSteer Forum:
Message
<blockquote data-quote="skidsteer.ca" data-source="post: 3013" data-attributes="member: 307"><p>Just going to paint small interior panels, seat bar, tube lines up the boom, tilt cyl,</p><p>Put on new drive belt today, put cover back over v belts on other end, already replaced water pump and thermostat (100.00 less at Isuzu then Bobcat), New muffler, Grill over rad.</p><p>Tilt pedal, seat bar and other misc linkage bushings, rebuilt batt tray, should be ready to assemble interior and replace cab tommorow. Have some wireing to do at key panel. Still have to finish bobtach tilt cyl boss.</p><p>Its coming I guess. See I have a oil leak from chain case. There is a dust cap, (like a front wheel bearing on truck uses) that goes on the gear reduction on the side of the chain case. I guess some oil seaped through there after we changed the case oil at fill it right up. Its near the top and likely won't leak much. But I want to get it drip free.</p><p>Think we will have close to 160 hours into this buy the time we are done.</p><p>Ken</p></blockquote><p></p>
[QUOTE="skidsteer.ca, post: 3013, member: 307"] Just going to paint small interior panels, seat bar, tube lines up the boom, tilt cyl, Put on new drive belt today, put cover back over v belts on other end, already replaced water pump and thermostat (100.00 less at Isuzu then Bobcat), New muffler, Grill over rad. Tilt pedal, seat bar and other misc linkage bushings, rebuilt batt tray, should be ready to assemble interior and replace cab tommorow. Have some wireing to do at key panel. Still have to finish bobtach tilt cyl boss. Its coming I guess. See I have a oil leak from chain case. There is a dust cap, (like a front wheel bearing on truck uses) that goes on the gear reduction on the side of the chain case. I guess some oil seaped through there after we changed the case oil at fill it right up. Its near the top and likely won't leak much. But I want to get it drip free. Think we will have close to 160 hours into this buy the time we are done. Ken [/QUOTE]
Verification
Post reply
Forums
Bobcat Skidsteer Forums
General Bobcat Skidsteer Forum
853 Project
Top